language
close
Address: No. 12, Zhixin 1st Road, Dagang Town, Nansha District, Guangzhou City, Guangdong Province
Location:Home - Application & Case - Customer case

NANPING ALUMINUM UPGRADES VERTICAL LINE: ONE ZEHENG NR01-BPOWDER BOOTH REPLACES TWO TRADITIONAL BOOTHS!

  • 232
    National Patent
  • 39
    Invention patent
  • 11
    High-tech products
  • 2
    Participate in customizing standards
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&
39;Segoe UI&

Overview:

With over 12 years of collaboration, Nanping Aluminum again deployed Zeheng’s NR01-B vertical line in April 2022, transforming its three-line dual-booth setup into a single-booth system to adapt to process changes and accelerate output.

After the upgrade, the line achieved:

·Monthly capacity increase of >20%

·Chain speed increase of 1–1.5 m/min

·Energy savings >50 kW/h

·Color-change time reduced to 5–15 min

·Powder consumption reduced by >10%

 


Strategy:

Zeheng’s NR01-B vertical system—featuring 19 patents and smart automation for recognition, control, and color change—was customized for Nanping Line 3. It lowers cost and labor while increasing monthly output by >20%.


Project Value :

1、Reduced Number of Booths: A single booth replaces the original dual booths. It meets the chain speed requirements for both shallow and deep groove profiles under the same conditions.

 

2、Energy Savings: Original dual-booth fan power was 55KW+55KW; now only 60KW is required, saving over 50KW/H.


3、Lower Powder Consumption: Powder recovery rate exceeds 98%, reducing consumption by over 10%.

 

4、Increased Production Efficiency: Capacity increased by over 20% from the original base. Maximum chain speed improved by 1-1.5 m/min; effective powder coating zone length is ≥5 meters.

 

5、Improved Quality: Film thickness variation on the same surface (high, medium, low areas) is ≤15μm. Guns coating vertically onto profile decorative surfaces, solving traditional blind spot issues.


6、Cleaner Worksite: Average color change time is 10 min/per, improving efficiency. Side panels, hangers, and floor triple self-cleaning devices ensure a clean production environment.


7Intelligent Control: Industry 4.0 central control system integrates all electrical equipment in the booth. Reciprocators, guns, extraction systems, and other devices operate in intelligent synergy, optimizing the coating process.