-
COATING PRODUCTION TIME SHORTENED BY 90%! CIMC LINGYU SPECIAL VEHICLE POWDER COATING LINE UPGRADE COMPLETED
Overview:Launched in May 2020, CIMC Lingyu's Phase I automated coating line (supplied by Zeheng) achieved trial production within two months. T…
Time:2020-05-29

For the transformation of the vertical line 3, we chose to cooperate with Zeheng again because of the excellent performance of Zeheng NR01 on the vertical line 2 and the advantages of this equipment in Industry 4.0. The commissioning of the new production line has greatly changed the production status of the third line of aluminum profile powder spraying in Nanping Aluminum. In addition to completely replacing the original two powder rooms with one powder room, saving more than 50% of labor, land and energy consumption, it also solved the traditional film thickness problem of aluminum profile surface treatment through intelligent control, intelligent exhaust, advanced structural design, etc., reduced production costs such as powder consumption, made the production site cleaner, and achieved a higher degree of intelligence.









